Client
Wates
Date of completion
February 2011
Value
£1.7m
Scope of works
-
Groundworks
-
RC frame
Project key points
-
Restricted site, within close proximity to the River Thames and Battersea Bridge
-
Groundworks including pile caps, ground beams, gas membrane, fusion welded drainage and an attenuation tank
-
The RC frame was almost entirely fair-faced concrete to a high specification including designed ply layouts
-
Four in-situ reinforced concrete staircases with fair-faced finishes on the top and bottom of the flights, including one feature staircase with exposed concrete balustrades, flights and soffits
-
All columns and shear walls were fair-faced concrete with designed bolt hole layouts including a feature wall along the length of the courtyard
Contact Toureen Group