55 - 58 PALL MALL

55–58 Pall Mall was demolished to make way for high-quality commercial units and office space.

The existing buildings suffered from disjointed floorplates, with differing levels, low ceiling heights and numerous columns, which together provided poor-quality accommodation. The new building was designed to deliver high-quality, contemporary space for progressive occupiers.

The façade of 55–58 Pall Mall was retained and renovated. It was carefully dismantled on site, removed, cleaned and stored before being reinstalled in a slightly extended form towards the end of the project. Elsewhere, the massing and façade materials were designed to integrate with the surrounding context. A range of materials was used, including Portland stone, bronze, stained oak, glazed brick, Welsh slate and granite.

Client: Simtem