This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
55 - 58 PALL MALL
55–58 Pall Mall was demolished to make way for high-quality commercial units and office space.
The existing buildings suffered from disjointed floorplates, with differing levels, low ceiling heights and numerous columns, which together provided poor-quality accommodation. The new building was designed to deliver high-quality, contemporary space for progressive occupiers.
The façade of 55–58 Pall Mall was retained and renovated. It was carefully dismantled on site, removed, cleaned and stored before being reinstalled in a slightly extended form towards the end of the project. Elsewhere, the massing and façade materials were designed to integrate with the surrounding context. A range of materials was used, including Portland stone, bronze, stained oak, glazed brick, Welsh slate and granite.
Client: Simtem