Project Profile: Maroush Factory

Client
Abouzaki Holdings
Date of completion
February 2014
Value
£5.6m
Demolition
Maroush 2

Scope of works

 

  • Demolition

  • Basement

  • Temporary works

  • Concrete frame

Maroush 3

Project key points

 

  • Construction of 5m deep basements by installing 8m deep contigious wall and introducing temporary work scheme using large diameter steel tubes across the site, then removing 10,000m³ of debris from site and construction of 700m deep concrete raft

  • Construction of 350mm deep ground floor flat slab and 250mm deep first, second and roof slab also 40m of ramp into the basement

  • Construction of stairs using Stairmaster

  • Construction of concrete walls and columns

  • All concrete finishes to achieve Type B finish

  • Installation of basement and ground drainage including the outfall to the main sewer

  • Waterproofing will be achieved using cavity drains, shotcrete to perimeter walls in the basement and external waterproofing to ground floor slab

  • Project registered for the Considerate Contractors Scheme, achieving an excellent BREAM rating