Project Profile: Hope Construction Materials

Client
Hope Construction Materials
Date of completion
April 2016
Value
£6.8m
Full Case Study Download
Hope image
hope concrete 1

Scope of works

 

  • Piling works

  • Construction of raft slabs for bulk store and bag warehouse

  • Construction of complex steel frame for bulk store and portal frame for bag warehouse

  • Installation of pre-cast panels, external roof and wall cladding

  • Site wide drainage/ services infrastructure and concrete hard standings throughout

  • Installation of all doors, perimeter fencing and multi-level walkways

hope 2

Project key points

 

  • Installation of 1500 pre-cast driven piles

  • Installation of deep drainage and attenuation tank system

  • All works carried out within 3 metres of Network Rail line serving HS1 and local services to Essex

  • Construction of complex steel frame to form cement storage cells in the bulk store building

  • Installation of 700 pre-cast units to form the cement store cells

  • Installation of cladding to bulk store and bag warehouse

  • Construction of 8000m² of external concrete hard standings

  • Toureen Group FORS Gold tipper lorries ensured programme efficiencies