Scope of works
-
Piling works
-
Construction of raft slabs for bulk store and bag warehouse
-
Construction of complex steel frame for bulk store and portal frame for bag warehouse
-
Installation of pre-cast panels, external roof and wall cladding
-
Site wide drainage/ services infrastructure and concrete hard standings throughout
-
Installation of all doors, perimeter fencing and multi-level walkways
Project key points
-
Installation of 1500 pre-cast driven piles
-
Installation of deep drainage and attenuation tank system
-
All works carried out within 3 metres of Network Rail line serving HS1 and local services to Essex
-
Construction of complex steel frame to form cement storage cells in the bulk store building
-
Installation of 700 pre-cast units to form the cement store cells
-
Installation of cladding to bulk store and bag warehouse
-
Construction of 8000m² of external concrete hard standings
-
Toureen Group FORS Gold tipper lorries ensured programme efficiencies