Project Profile: Biogen Plant, Baldock

Client
Biogen - Renewable Energy Producer
Date of completion
Septemeber 2011
Value
£4.2m
Groundworks, Cut and Fill, Substructure foundation works incl. circular RC bases up to 40m2 dig, RC walls to Bunded Storage area, flood defence. Flood gates, steel frame building incl. precast, reinforced concrete and brick work superstructure, all electrical and mechanical services. Extensive landscaping, drainage and services works, extensive 278 works on adjacent dual carriageway creating suitable site access

Scope of works

 

  • Appointed directly by the client, Toureen performed the role of main contractor and oversaw the site being developed from a 9 acre (37,000m²) parcel of green field land into a fully functioning anaerobic digestion facility

  • Groundworks

  • Cut and fill

  • Substructure foundation works

 

Project key points

 

  • Substructure foundation works including circular reinforced concrete bases up to 40m² dig, reinforced concrete walls to bunded storage area, flood defence

  • Flood gates, steel frame building including pre-cast, reinforced concrete and brick work superstructure, all electrical and mechanical services

  • Extensive landscaping, drainage and services works, extensive section 278 works on adjacent dual carriageway creating suitable site access